  Chaining on Sloping Ground (Simple Notes) When measuring distances on a hill or slope, we always need to find the flat horizontal distance , not the actual sloped ground distance. There are two main ways to do this: 1. Direct Method (Stepping Method) In this method, you measure the flat horizontal distance directly on the field by creating small, flat steps. Best For: Short, bumpy, irregular, or gentle slopes. How it works (Step-by-Step): Start: The Follower holds the 0-end of the tape flat on the starting ground point A. Stretch: The Leader pulls a short, comfortable length of the tape forward and lifts it up until it looks perfectly flat and straight by eye judgment. Drop: Because the front end of the tape is hanging in the air, the Leader drops a plumb-bob (a weight on a string) down to find the exact vertical point on the ground. Mark & Repeat: They stick an arrow into that ground point. The Follower moves to this new arrow, and they repeat the steps all the way u...

steel structure MCQ part 1

 1- Main advantage of a steel members is that it 

A)- has strength and long life 

B)- cannot replace easily 

C)- is water right and leak proof 

D)- all of above 

2- weight of steel per cubic meters is taken to be 

A)- 7900kg 

B)- 3000 kg 

C)- 1200 kg 

D)- 800 kg 

3- The structure are 

A)- means of transferring load to be the substructure 

B)- used to resist external load and moment 

C)- means of transferring forces and moments 

D)- all of above are correct 

4- the density of steel used in the structure members should be 

A)-1 gm/mm3 

B)- 6.4 gm/mm3 

C)- 7.9 gm/mm3 

D)- 13.6 gm/mm3 

5- The percentage of carbon in structural steel 

A)- 0.20 to 0.27% 

B)- 0.70 to 0.80% 

C)-1.20 to 1.27% 

D)- 1.70 to 1.80% 

6- A channel section consist of 

A)- two webs 

B)- two flange 

C)- two webs and two flanges 

D)- one web and two flanges

7- The size of the rivet is expressed by the 

A)-Length of shank 

B)-diameter of shank 

C)- type of head 

D)- none of above 

8- The rivets which are driven at atmospheric temperature are known as 

A)- Power driven shop rivets 

B)- hand driven rivets 

C)- cold driven rivets 

D)- none of above 

9- The diameter of the rivet hole is made larger than the diameter of rivet by 2mm for rivet diameter

A)- upto 12mm 

B)-upto 22mm

C)-upto 15 mm 

D)- exceeding 25 mm 

10-the gross dia of rivet is the dia of 

A)- cold rivet measured before driving 

B)- rivet measured after driving 

C)-rivet hole 

D)-none of above 

11- The percentage of sulphur in structural steel is restricted to 

A)0.055 

B)0.15 

C)0.55

D)0.75 

12- for rivet diameter upto 25 mm ,the diameter of rivet hole is larger than the diameter of rivet by 

A)1mm

B) 2mm

C)5 mm 

D) 2.5 mm 

13- The distance between centre to centre of two adjacent rivert holes should be less than 

A) 1.5 times the diameter of rivet hole 

B) 1.5 times the diameter of rivet 

C) 1.5 times the diameter of rivet head 

D) 2.5 times the diameter of rivet.

14-Generally the diameter of rivet used in structural members is not less than 

A) 6mm

B)12mm

C)16mm

D)20mm

15- A strut is a 

A) flexible member 

B) compression member 

C)torsional memeber 

D) tension memeber 

16- A tie is a 

A) flexible memeber 

B) compression memeber 

C) torsional memeber 

D)tension member 

17-types of riveted joint 

A) lap joint 

B) Butt joint 

C) Both A and B 

D) None of above 

18- Maximum pitch in compression memeber 

A) 12t or 200mm whichever is less 

B) 16t or 200mm whichever is less 

C) 32t or 300mm whichever is less 

D) all of above 

19-Failure of rivet joint may be 

A) shear failure of rivet 

B) shear failure of plates

C) tearing failure of plates 

D) All of above 

20-Types of fillet weld 

A) side fillet weld 

B) End fillet weld 

C) Diagonal fillet weld 

D) all of above 








Comments

  1. Sir last m Answer bhi de dijiye..🙏

    ReplyDelete
  2. This comment has been removed by the author.

    ReplyDelete
  3. This comment has been removed by the author.

    ReplyDelete
    Replies
    1. 1-A
      2-A
      3-D
      4-C
      5-A
      6-D
      7-B
      8-C
      9-D
      10-C

      Delete
  4. This comment has been removed by the author.

    ReplyDelete
  5. 1. A
    2. A
    3. D
    4. C
    5. A
    6. D
    7. B
    8. C
    9. D
    10. C

    ReplyDelete
  6. 11-A
    12-B
    13-A
    14-D
    15-C
    16-D
    17-C
    18-A
    19-A
    20-D

    ReplyDelete
  7. 1.d
    2.a
    3.d
    4.c
    5.a
    6.d
    7.b
    8.c
    9.d
    10.c

    ReplyDelete
  8. 1 A
    2 A
    3 A
    4 C
    5 A
    6 D
    7 B
    8 C
    9 D
    10 C
    11 A
    12 A
    13 D
    14 B
    15 B
    16 D
    17 C
    18 B
    19 D
    20 D

    ReplyDelete
  9. 1.a
    2.a
    3.a
    4.c
    5.a
    6.d
    7.b
    8.c
    9.d
    10.c
    11.a

    ReplyDelete
  10. 1-A
    2-A
    3-D
    4-C
    5-A
    6-D
    7-B
    8-C
    9-D
    10-C

    ReplyDelete
  11. 1(D)
    2 A
    3 D
    4 C
    5 A
    6 D
    7 B
    8 C
    9 D
    10 A
    11 B
    12 D
    13 A
    14 B
    15 B
    16 D
    17 C
    18 B
    19 D
    20 D

    ReplyDelete
  12. 11.A
    12.B
    13.A
    14.D
    15.C
    16.D
    17.C
    18.A
    19.A
    20.D

    ReplyDelete
  13. Replies
    1. 1.d. 11.d
      2.a. 12.b
      3.d. 13.d
      4.c. 14.b
      5.a. 15.b
      6.d. 16.d
      7.b. 17.c
      8.a. 18.b
      9.d. 19.d
      10.a. 20.d

      Delete
    2. This comment has been removed by the author.

      Delete
  14. This comment has been removed by the author.

    ReplyDelete
  15. 1 (d). 2 (a). 3 (d). 4.(c). 5 (a). 6 (d). 7 (b). 8 (c). 9 (d). 10 (b)

    ReplyDelete
  16. This comment has been removed by the author.

    ReplyDelete
  17. Akhand Pratap Singh
    1 - d
    2 - a
    3 -
    4 -c
    5 -a
    6 - d
    7 - b
    8 - a
    9 - d
    10 - c

    ReplyDelete
    Replies
    1. 11 - a
      12 - a
      13 -d
      14 -b
      15 -b
      16 - d
      17 - c
      18 - b
      19 - a
      20 - d

      Delete
    2. 1.a
      2.a
      3.a
      4.c
      5.a
      6.d
      7.b
      8.c
      9.d
      10.c
      11 - a
      12 - a
      13 -d
      14 -b
      15 -b
      16 - d
      17 - c
      18 - b
      19 - a
      20 - d

      Delete
  18. 1. A
    2. A
    3.A
    4.c
    5. A
    6.b
    7.b
    8.c
    9. D
    10. C
    11. A
    12. D
    13
    14
    15 d
    16 c
    17. A
    18. A
    19. D
    20 a

    ASHUTOSH SHARMA

    ReplyDelete
  19. 1(D)
    2 A
    3 D
    4 C
    5 A
    6 D
    7 B
    8 C
    9 D
    10 A
    11 B
    12 D
    13 A
    14 B
    15 B
    16 D
    17 C
    18 B
    19 D
    20 D
    Arun kumar

    ReplyDelete
  20. 1 A
    2 A
    3 D
    4 C
    5 A
    6 D
    7 B
    8 C
    9 D
    10 C
    11 A
    12 B
    13 D
    14 A
    15 B
    16 D
    17 C
    18 A
    19 A
    20 D

    ReplyDelete
  21. 1(D)
    2 A
    3 D
    4 C
    5 A
    6 D
    7 B
    8 C
    9 D
    10 A
    11 B
    12 D
    13 A
    14 B
    15 B
    16 D
    17 C
    18 B
    19 D
    20 D
    Ashish Kumar Pandey

    ReplyDelete
  22. 1.A
    2.A
    3.D
    4.C
    5.A
    6.D
    7.B
    8.C
    9.D
    10.C
    11.A
    12.B
    13.A
    14.D
    15.C
    16.D
    17.C
    18.A
    19.A
    20.D

    ReplyDelete
  23. Vichitra Mani Singh

    1-a
    2-a
    3-d
    4-c
    5-a
    6-d
    7-b
    8-c
    9-d
    10-c
    11-a
    12-b
    13-a
    14-d
    15-c
    16-d
    17-c
    18-a
    19-a
    20-d

    ReplyDelete

Post a Comment

Popular posts from this blog

Jarib , pictures, photo,जरीब का चित्र, chain survey,Part3 जरीब सर्वेक्षण chain survey

  जरीब सर्वेक्षण (Chain Survey) | सिद्धांत, प्रकार, फीता और उपकरण  Introduction सर्वेक्षण (Surveying) सिविल इंजीनियरिंग का एक महत्वपूर्ण भाग है। इसमें क्षेत्र की दूरी, दिशा और सीमाओं को मापा जाता है। जरीब सर्वेक्षण (Chain Survey) सबसे सरल और प्राचीन तकनीक है, जिसमें जरीब या फीता का उपयोग किया जाता है।  जरीब (Chain) क्या है? जरीब एक यांत्रिक उपकरण है जिसका उपयोग रेखीय दूरी नापने (Linear Measurement) के लिए किया जाता है। यह जस्तीकृत मृदु इस्पात की कड़ियों से बनी होती है। दोनों सिरों पर पीतल के हत्थे (Handles) लगे होते हैं। यह छोटे और समतल क्षेत्रों के सर्वेक्षण के लिए उपयुक्त है।  जरीब को चेन सर्वे (Chain Survey) में मुख्य उपकरण माना जाता है।  फीता (Tape) क्या है? फीता (Tape) भी दूरी मापने का उपकरण है लेकिन इसमें कड़ियाँ नहीं होतीं। यह जरीब से हल्का और अधिक शुद्ध (Accurate) होता है। इसे कई प्रकार के पदार्थों से बनाया जाता है: सूती फीता (Cotton Tape) मेटलिक फीता (Metallic Tape) इस्पाती फीता (Steel Tape) इन्वार फीता (Invar Tape) ...

Surveying in Civil Engineering: सर्वेक्षण क्या है? Types, Principles & Uses

सिविल इंजीनियरिंग में सर्वेक्षण (Surveying in Civil Engineering) सर्वेक्षण क्या है? (What is Surveying?) Surveying in Civil Engineering सिविल इंजीनियरिंग की एक महत्वपूर्ण शाखा है, जिसमें भूमि पर स्थित विभिन्न बिंदुओं की दूरी, कोण, ऊँचाई और स्थिति का मापन करके नक्शा (Map) तथा निर्माण कार्य के लिए आवश्यक डेटा तैयार किया जाता है। Surveying का उपयोग सड़क, पुल, रेलवे, नहर, भवन और अन्य निर्माण परियोजनाओं में किया जाता है। सर्वेक्षण का उद्देश्य (Purpose of Surveying) सटीक नक्शा और योजना बनाना – टोपोग्राफिकल और कैडस्ट्रल नक्शा तैयार करना। निर्माण स्थल का चयन – सड़क, रेलवे, पाइपलाइन और सीवर लाइन के लिए उचित स्थल चुनना। बिंदुओं की स्थिति ज्ञात करना – प्राकृतिक और कृत्रिम बिंदुओं की स्थिति मापना। ऊंचाई और गहराई मापन – भूमि की स्थलाकृति और ऊंचाई निर्धारण। निर्माण कार्यों के लिए लेआउट बनाना – भवन, पुल, नहर आदि के लिए मार्किंग। भूमि की सीमाओं का निर्धारण – संपत्ति और कानूनी उद्देश्यों के लिए। मिट्टी की कटाई और भराई का परिमाण – निर्माण में आवश्यक माप। सर्वेक्षण का वर्गीक...

Contour (कॉन्टूर) क्या है? | Types, Uses, Importance of Contour in Surveying – Civil Engineering Notes in Hindi

  Contour क्या होता है कॉनटूर (Contour) शब्द का प्रयोग सर्वेक्षण (Surveying) में बहुत आम है। यह शब्द जमीन की ऊँचाई और ढाल (slope) को दिखाने के लिए इस्तेमाल किया जाता है। कॉनटूर लाइनों की मदद से हम किसी इलाके की सतह (surface) को 3-D रूप में समझ सकते हैं — यानी बिना उस जगह पर जाए यह पता लगाया जा सकता है कि जमीन ऊँची है या नीची।   कॉनटूर की परिभाषा (Definition of Contour) कॉनटूर (Contour) एक काल्पनिक रेखा (Imaginary Line) होती है जो उन सभी बिंदुओं (points) को जोड़ती है जिनकी ऊँचाई (elevation) समुद्र तल (mean sea level) से बराबर होती है । उदाहरण: अगर किसी क्षेत्र में 100 मीटर ऊँचाई वाले सारे बिंदुओं को जोड़ दिया जाए, तो वह रेखा 100 मीटर की कॉनटूर लाइन कहलाएगी। इसका मतलब यह कि उस लाइन पर आने वाले हर बिंदु की ऊँचाई 100 मीटर है। कॉनटूर का उद्देश्य (Purpose of Contour Map) कॉनटूर लाइनों का मुख्य उद्देश्य है — जमीन के प्राकृतिक आकार (shape) और ढाल को दिखाना ताकि इंजीनियर और सर्वेयर उस क्षेत्र की सही योजना बना सकें। मुख्य उद्देश्य: जमीन के आकार और ढाल को समझना। ...