  Chaining on Sloping Ground (Simple Notes) When measuring distances on a hill or slope, we always need to find the flat horizontal distance , not the actual sloped ground distance. There are two main ways to do this: 1. Direct Method (Stepping Method) In this method, you measure the flat horizontal distance directly on the field by creating small, flat steps. Best For: Short, bumpy, irregular, or gentle slopes. How it works (Step-by-Step): Start: The Follower holds the 0-end of the tape flat on the starting ground point A. Stretch: The Leader pulls a short, comfortable length of the tape forward and lifts it up until it looks perfectly flat and straight by eye judgment. Drop: Because the front end of the tape is hanging in the air, the Leader drops a plumb-bob (a weight on a string) down to find the exact vertical point on the ground. Mark & Repeat: They stick an arrow into that ground point. The Follower moves to this new arrow, and they repeat the steps all the way u...

Form work

 Form work 

Form work is a temporary structure that hold the plastic concrete in its original position until it is sufficiently rigid. When the concrete is able to lift its own and overhead load, the form work is removed.



The form work should be sufficiently strong and firm to bear the weight of wet concrete, the impacts generated when compaction of concrete and the load of concreting workers, if the form work bends or shrinks at the time of concreting or during the hardening period of the concrete ,the final appearance of the concrete structure will be distorted, which is very difficult to fix later.if the concrete components are bent or bent slightly for some reason while moulded , then later ,like other construction materials, they cannot repaired.the deffective part has to be broken and re cast. 

Part of form work 

The complete form work is divided into two parts.

(1) Shuttering 

(2) Centering Or Staging 

1) Shuttering

The mold that is prepared to mold the concrete components into the desired shape is called shuttring in order to keep the mold in the desired position, 

Shuttering comes in direct contact with concrete.The inner surface of the shuttering should be clean,knotless, flat and smooth to get the best finish of the concrete component. In high quality concrete works.when the inner surface of the Shuttering is specially prepared,there is no need to separately plaster the concrete components. 



(2) Centering Or Staging 

the vertical and diagonal components given below it are called stagging or props.

Staging is not required when the concrete component is moulded on the ground floor or foundation.templates are used to mold precast units of concrete, which are mostly made of metal.

The staging should be firm enough so that the weight does not get stuck down, but there should not be any problem while removing it. 



Requirements of a good form work.

A good form work should have the following characteristics: 

(1) Concrete Perimeter 

Form work should be pure and accurate according to the measurements of concrete components. Concrete shrinks at the time of setting ,so this should be taken care in the inner measurement of the Shuttering. 

(2) Flat Surface 

The inner surface of the Shuttering should be clean, flat, knotless and seamless so that the results of concrete components are beautiful and smooth.The form should be inspected before pouring concrete.

(3) Persistence 

The form work should be strong and firm enough to bear the weight of the wet concrete and the load of compact of vibrators and workers working on it. The reinforced concrete is weighted 2500 kg/cum.

(4) Waterproofing

The Shuttering should be waterproof so that it does not absorb the concrete water. All the inner joints of the mould should be completely waterproof, while pouring the concrete, its slurry should not drip out of the joints of the form work.

(5) Low Load 

The form work load should be reduced,so that there is no difficulty while applying/ removing them.

(6) Ease of removal 

Staging or shuttering should be made and erected in such a way that it can be removed easily after construction.it should not stick to the concrete surface.

(7) Strength of props 

The strength of the props of should be strong and firm, beacuse when they are rolled, where the whole work is destroyed,the life of the workers working on it will also be in danger 

(8) Standard Section 

Section of form work should adopt standard dimensions so that they can be used repeatedly.

(9) Generally Security ...

There should not be any hindrance in other activities going on at the construction site due to the form work.

(10) Cost 

The cost of form work is about 20 to 35% of the cost of total concrete construction. Therefore ,it should be economical and it can be reused when needed.



Comments

Popular posts from this blog

Jarib , pictures, photo,जरीब का चित्र, chain survey,Part3 जरीब सर्वेक्षण chain survey

  जरीब सर्वेक्षण (Chain Survey) | सिद्धांत, प्रकार, फीता और उपकरण  Introduction सर्वेक्षण (Surveying) सिविल इंजीनियरिंग का एक महत्वपूर्ण भाग है। इसमें क्षेत्र की दूरी, दिशा और सीमाओं को मापा जाता है। जरीब सर्वेक्षण (Chain Survey) सबसे सरल और प्राचीन तकनीक है, जिसमें जरीब या फीता का उपयोग किया जाता है।  जरीब (Chain) क्या है? जरीब एक यांत्रिक उपकरण है जिसका उपयोग रेखीय दूरी नापने (Linear Measurement) के लिए किया जाता है। यह जस्तीकृत मृदु इस्पात की कड़ियों से बनी होती है। दोनों सिरों पर पीतल के हत्थे (Handles) लगे होते हैं। यह छोटे और समतल क्षेत्रों के सर्वेक्षण के लिए उपयुक्त है।  जरीब को चेन सर्वे (Chain Survey) में मुख्य उपकरण माना जाता है।  फीता (Tape) क्या है? फीता (Tape) भी दूरी मापने का उपकरण है लेकिन इसमें कड़ियाँ नहीं होतीं। यह जरीब से हल्का और अधिक शुद्ध (Accurate) होता है। इसे कई प्रकार के पदार्थों से बनाया जाता है: सूती फीता (Cotton Tape) मेटलिक फीता (Metallic Tape) इस्पाती फीता (Steel Tape) इन्वार फीता (Invar Tape) ...

Surveying in Civil Engineering: सर्वेक्षण क्या है? Types, Principles & Uses

सिविल इंजीनियरिंग में सर्वेक्षण (Surveying in Civil Engineering) सर्वेक्षण क्या है? (What is Surveying?) Surveying in Civil Engineering सिविल इंजीनियरिंग की एक महत्वपूर्ण शाखा है, जिसमें भूमि पर स्थित विभिन्न बिंदुओं की दूरी, कोण, ऊँचाई और स्थिति का मापन करके नक्शा (Map) तथा निर्माण कार्य के लिए आवश्यक डेटा तैयार किया जाता है। Surveying का उपयोग सड़क, पुल, रेलवे, नहर, भवन और अन्य निर्माण परियोजनाओं में किया जाता है। सर्वेक्षण का उद्देश्य (Purpose of Surveying) सटीक नक्शा और योजना बनाना – टोपोग्राफिकल और कैडस्ट्रल नक्शा तैयार करना। निर्माण स्थल का चयन – सड़क, रेलवे, पाइपलाइन और सीवर लाइन के लिए उचित स्थल चुनना। बिंदुओं की स्थिति ज्ञात करना – प्राकृतिक और कृत्रिम बिंदुओं की स्थिति मापना। ऊंचाई और गहराई मापन – भूमि की स्थलाकृति और ऊंचाई निर्धारण। निर्माण कार्यों के लिए लेआउट बनाना – भवन, पुल, नहर आदि के लिए मार्किंग। भूमि की सीमाओं का निर्धारण – संपत्ति और कानूनी उद्देश्यों के लिए। मिट्टी की कटाई और भराई का परिमाण – निर्माण में आवश्यक माप। सर्वेक्षण का वर्गीक...

Contour (कॉन्टूर) क्या है? | Types, Uses, Importance of Contour in Surveying – Civil Engineering Notes in Hindi

  Contour क्या होता है कॉनटूर (Contour) शब्द का प्रयोग सर्वेक्षण (Surveying) में बहुत आम है। यह शब्द जमीन की ऊँचाई और ढाल (slope) को दिखाने के लिए इस्तेमाल किया जाता है। कॉनटूर लाइनों की मदद से हम किसी इलाके की सतह (surface) को 3-D रूप में समझ सकते हैं — यानी बिना उस जगह पर जाए यह पता लगाया जा सकता है कि जमीन ऊँची है या नीची।   कॉनटूर की परिभाषा (Definition of Contour) कॉनटूर (Contour) एक काल्पनिक रेखा (Imaginary Line) होती है जो उन सभी बिंदुओं (points) को जोड़ती है जिनकी ऊँचाई (elevation) समुद्र तल (mean sea level) से बराबर होती है । उदाहरण: अगर किसी क्षेत्र में 100 मीटर ऊँचाई वाले सारे बिंदुओं को जोड़ दिया जाए, तो वह रेखा 100 मीटर की कॉनटूर लाइन कहलाएगी। इसका मतलब यह कि उस लाइन पर आने वाले हर बिंदु की ऊँचाई 100 मीटर है। कॉनटूर का उद्देश्य (Purpose of Contour Map) कॉनटूर लाइनों का मुख्य उद्देश्य है — जमीन के प्राकृतिक आकार (shape) और ढाल को दिखाना ताकि इंजीनियर और सर्वेयर उस क्षेत्र की सही योजना बना सकें। मुख्य उद्देश्य: जमीन के आकार और ढाल को समझना। ...