100 Important Points Every Site Engineer Must Know – Hindi + English Mix Site Engineer Guide: 100 Key Points for Field & Exam in Hindi Top 100 Important Points for Civil Site Engineer – Hindi & English Site Engineer Tips: 100 Essential Points for Construction & Exams

 

1. Foundation (नींव)

  • Types: Shallow (Strip, Isolated, Raft) और Deep (Pile, Caisson, Well)

  • Load Transfer: Foundation का काम load को soil तक safely पहुँचाना है।

  • Soil Bearing Capacity: हमेशा पता होना चाहिए।

  • Settlement:

    • Uniform Settlement: Building evenly नीचे बैठती है

    • Differential Settlement: अलग-अलग parts अलग speed से नीचे, dangerous हो सकता है

  • Water Table Effect: High water table वाले sites में design अलग।


2. Structural Components (संरचनात्मक भाग)

  • Column (स्तंभ): Vertical load carry करता है

  • Beam (त्राव/बीम): Slab और horizontal load support करता है

  • Slab (छत): Load को beams तक transfer करता है, types: One-way, Two-way

  • Lintel: Doors/windows ke ऊपर load transfer करता है

  • Staircase & Roof: Load distribution aur safety ke liye important


3. Materials (सामग्री)

  • Cement, Sand, Aggregate: Quality और mix ratio पता होना चाहिए

  • Concrete (CC & RCC):

    • RCC: Compression – concrete, Tension – steel

    • Water-Cement Ratio: Strength ke liye critical

  • Steel: Yield strength, grade aur placement समझना जरूरी

  • Bricks & Blocks: Types, bonding pattern (English/Flemish bond), strength


4. Construction Techniques (निर्माण तकनीक)

  • Brick masonry vs Block masonry

  • Concrete pouring और curing (7 days minimum)

  • Formwork/Shuttering: Accurate size & alignment ke liye

  • Waterproofing: Terrace, bathroom, basement me जरूरी

  • Plastering & Finishing: Smooth aur protective finish


5. Load & Design Considerations (लोड और डिज़ाइन)

  • Dead Load: Building ka khud ka weight

  • Live Load: Human, furniture etc.

  • Wind & Seismic Load: Earthquake prone area me design

  • Load Combinations: IS 456 ke rules follow karna


6. Safety & Codes (सुरक्षा और कोड)

  • IS Codes:

    • IS 456 – Concrete

    • IS 1893 – Earthquake

    • IS 3370 – Water tanks

  • Fire safety aur escape routes

  • Ventilation & Lighting standards

  • Stair slope aur handrail height


7. Utilities & Services (सुविधाएँ)

  • Plumbing & Drainage layout

  • Electrical conduit planning

  • HVAC ducts (if applicable)


8. Site Survey & Planning (साइट सर्वे और प्लानिंग)

  • Plot leveling & contouring

  • Soil testing & bore log

  • Site drainage & rainwater management

  • Building orientation (Sunlight & Wind ke liye)


9. Documentation (दस्तावेज़)

  • Drawings: Plan, Section, Elevation, Detail

  • BOQ (Bill of Quantity)

  • Material Testing Reports     


1. Site Survey & Planning (1–15)

  1. Site leveling ka process

  2. Plot orientation aur sunlight planning

  3. Contour mapping

  4. Soil testing aur bore log ka importance

  5. Water table check

  6. Site drainage planning

  7. Rainwater harvesting concept

  8. Access road aur site approach planning

  9. Plot boundary verification

  10. Plot area calculation

  11. North direction finding (Compass)

  12. Setting out of foundation

  13. Site clearance before construction

  14. Vegetation removal & site prep

  15. Temporary site office setup


2. Foundation (16–30)

  1. Types of foundation (Shallow/Deep)

  2. Load transfer concept

  3. Bearing capacity of soil

  4. Uniform vs Differential settlement

  5. Soil compaction importance

  6. Footing excavation method

  7. Base preparation before concrete

  8. PCC (Plain Cement Concrete) under footing

  9. Reinforcement detailing for footing

  10. Foundation curing process

  11. Dewatering for high water table

  12. Foundation alignment check

  13. Depth of foundation

  14. Column positioning & layout

  15. Anchor bolts installation


3. Concrete & Reinforcement (31–45)

  1. RCC mix design knowledge

  2. Water-cement ratio importance

  3. Slump test for workability

  4. Cube test for strength

  5. Curing process & duration

  6. Beam reinforcement placement

  7. Column reinforcement placement

  8. Slab reinforcement (one-way/two-way)

  9. Bar bending schedule reading

  10. Tying & binding of steel

  11. Cover blocks use

  12. Concrete pouring technique

  13. Vibrator usage

  14. Temperature & shrinkage control

  15. Formwork removal timing


4. Masonry & Walls (46–55)

  1. Brick vs Block masonry

  2. Bond patterns (English/Flemish)

  3. Plumb & level checking

  4. Mortar mix ratio

  5. Curing of masonry

  6. Wall thickness check

  7. Lintel installation

  8. Control joints in walls

  9. Cavity wall concept

  10. Damp proof course (DPC) installation


5. Flooring & Finishing (56–65)

  1. PCC & RCC flooring difference

  2. Tile & marble laying method

  3. Floor leveling

  4. Screeding process

  5. Expansion joints in flooring

  6. Plastering mix ratio

  7. Internal & external plaster

  8. Surface finishing types

  9. Painting prep & application

  10. Waterproofing in terraces & bathrooms


6. Doors, Windows & Roofing (66–75)

  1. Door & window alignment

  2. Lintel & frame checking

  3. Roofing types (RCC, truss, sheet)

  4. Roof slope checking

  5. Waterproofing in roof

  6. Parapet wall construction

  7. Skylight & ventilator installation

  8. Roof reinforcement detailing

  9. Drainage outlet provision

  10. Temporary shuttering safety


7. Safety & Codes (76–85)

  1. Personal protective equipment (PPE) use

  2. Site safety signage

  3. Fire safety awareness

  4. First aid availability

  5. Scaffolding safety

  6. Ladder & stair safety

  7. Electrical safety on site

  8. Material storage safety

  9. IS codes reference (IS 456, IS 1893, etc.)

  10. Earthquake & wind load awareness


8. Utilities & Services (86–95)

  1. Plumbing layout reading

  2. Drainage slope checking

  3. Water supply system

  4. Electrical conduit layout

  5. HVAC ducts (if applicable)

  6. Rainwater drainage pipe installation

  7. Sanitary fittings installation

  8. Fire hydrant & pipeline checking

  9. Cable trenching for electricity

  10. Manhole & inspection chamber checking


9. Documentation & Quality Control (96–100)

  1. Site daily report maintenance

  2. Material testing record

  3. Quality inspection checklist

  4. Progress measurement (length, area, volume)

  5. Bill of quantity (BOQ) verification






Comments

Popular posts from this blog

Jarib , pictures, photo,जरीब का चित्र, chain survey,Part3 जरीब सर्वेक्षण chain survey

  जरीब सर्वेक्षण (Chain Survey) | सिद्धांत, प्रकार, फीता और उपकरण 📌 Introduction सर्वेक्षण (Surveying) सिविल इंजीनियरिंग का एक महत्वपूर्ण भाग है। इसमें क्षेत्र की दूरी, दिशा और सीमाओं को मापा जाता है। जरीब सर्वेक्षण (Chain Survey) सबसे सरल और प्राचीन तकनीक है, जिसमें जरीब या फीता का उपयोग किया जाता है। 🔹 जरीब (Chain) क्या है? जरीब एक यांत्रिक उपकरण है जिसका उपयोग रेखीय दूरी नापने (Linear Measurement) के लिए किया जाता है। यह जस्तीकृत मृदु इस्पात की कड़ियों से बनी होती है। दोनों सिरों पर पीतल के हत्थे (Handles) लगे होते हैं। यह छोटे और समतल क्षेत्रों के सर्वेक्षण के लिए उपयुक्त है। 👉 जरीब को चेन सर्वे (Chain Survey) में मुख्य उपकरण माना जाता है। 🔹 फीता (Tape) क्या है? फीता (Tape) भी दूरी मापने का उपकरण है लेकिन इसमें कड़ियाँ नहीं होतीं। यह जरीब से हल्का और अधिक शुद्ध (Accurate) होता है। इसे कई प्रकार के पदार्थों से बनाया जाता है: सूती फीता (Cotton Tape) मेटलिक फीता (Metallic Tape) इस्पाती फीता (Steel Tape) इन्वार फीता (Invar Tape) 🔹 जरीब सर्व...

Part4जरीब सर्वेक्षण( उपकरण)

  खसका दंड।खसका दंड का प्रयोग  ये भी आरेखन दण्ड की तरह ही होता है। परन्तु इसके ऊपरी सिरे पर जरीब की हैंडल फसाने के लिए एक खांचा बना रहता है।जिसकी सहायता से खाई या झाड़ियों वाली स्थान में  जरीब के द्वारा नाप ली जाती है। खूँटी।  खूँटी का कार्य  खूँटी को सर्वेक्षण स्टेशनो की पहचान करने के लिए उस बिंदु पर गाड़ दी जाती है।ये लकड़ी  की बनी होती है। उसके ऊपर स्टेशन का नाम लिख दिया जाता है। उसकी लम्बाई 15 cm से 20 cm तक होती है। इसका शीर्ष 5cmx5cm वर्गाकार होता है।  साहुल।साहुल का कार्य  साहुल के द्वारा कम्पास , लेवल, थियोडोलाइट, आदि उपकरण को स्टेशन बिंदु पर केन्द्रण करने के लिए प्रयोग किया जाता है। इसके अतिरिक्त ढालू जमीन पर जरीब मापन करते समय तथा आरेखन दण्ड को ठीक ऊर्ध्वाधर खड़ा करने में साहुल द्वारा जांच की जाती है। ये धातु का शंकुनुमा पिण्ड होता है।जिसके शीर्ष में एक मजबूत डोरी बंधी होती हैं। झाडियाँ । झाडियाँ का कार्य आरेखन दण्डो दूर से पहचान करने के लिये,इनके शीर्ष पर कपड़े की चौकोर  लाल या सफेद रंग की झाडियाँ बांध दी जाती है।   समकोण...

what is surveying in hindi ,Surveying ,सर्वेक्षण Part 1

सिविल इंजीनियरिंग में सर्वेक्षण (Surveying in Civil Engineering) Meta Description: सिविल इंजीनियरिंग में सर्वेक्षण क्या है? इसका उद्देश्य, प्रकार, सिद्धांत और महत्व समझें। Land Survey, Engineering Survey, Topographical Survey और Theodolite Survey की पूरी जानकारी। Keywords: सर्वेक्षण सिविल इंजीनियरिंग, Engineering Survey, Land Survey, Topographical Survey, Cadastral Survey, Theodolite Survey, Plane Table Survey, Hydrographic Survey, Surveying Principles सर्वेक्षण क्या है? (What is Surveying?) सर्वेक्षण सिविल इंजीनियरिंग की वह शाखा है, जो किसी क्षेत्र पर बिंदुओं की स्थिति, दूरी और कोणों का मापन कर नक्शे और लेआउट तैयार करती है। यह सड़क, पुल, रेलवे, नहर, पाइपलाइन और भवन निर्माण जैसी परियोजनाओं के लिए आधार प्रदान करता है। Keywords: Surveying in Civil Engineering, Civil Engineering Survey, Construction Survey सर्वेक्षण का उद्देश्य (Purpose of Surveying) सटीक नक्शा और योजना बनाना – टोपोग्राफिकल और कैडस्ट्रल नक्शा तैयार करना। निर्माण स्थल का चयन – सड़क, रेलवे, पाइपलाइन और सीवर लाइन ...