100 Important Points Every Site Engineer Must Know – Hindi + English Mix Site Engineer Guide: 100 Key Points for Field & Exam in Hindi Top 100 Important Points for Civil Site Engineer – Hindi & English Site Engineer Tips: 100 Essential Points for Construction & Exams
1. Foundation (नींव)
-
Types: Shallow (Strip, Isolated, Raft) और Deep (Pile, Caisson, Well)
-
Load Transfer: Foundation का काम load को soil तक safely पहुँचाना है।
-
Soil Bearing Capacity: हमेशा पता होना चाहिए।
-
Settlement:
-
Uniform Settlement: Building evenly नीचे बैठती है
-
Differential Settlement: अलग-अलग parts अलग speed से नीचे, dangerous हो सकता है
-
-
Water Table Effect: High water table वाले sites में design अलग।
2. Structural Components (संरचनात्मक भाग)
-
Column (स्तंभ): Vertical load carry करता है
-
Beam (त्राव/बीम): Slab और horizontal load support करता है
-
Slab (छत): Load को beams तक transfer करता है, types: One-way, Two-way
-
Lintel: Doors/windows ke ऊपर load transfer करता है
-
Staircase & Roof: Load distribution aur safety ke liye important
3. Materials (सामग्री)
-
Cement, Sand, Aggregate: Quality और mix ratio पता होना चाहिए
-
Concrete (CC & RCC):
-
RCC: Compression – concrete, Tension – steel
-
Water-Cement Ratio: Strength ke liye critical
-
-
Steel: Yield strength, grade aur placement समझना जरूरी
-
Bricks & Blocks: Types, bonding pattern (English/Flemish bond), strength
4. Construction Techniques (निर्माण तकनीक)
-
Concrete pouring और curing (7 days minimum)
-
Formwork/Shuttering: Accurate size & alignment ke liye
-
Waterproofing: Terrace, bathroom, basement me जरूरी
-
Plastering & Finishing: Smooth aur protective finish
5. Load & Design Considerations (लोड और डिज़ाइन)
-
Dead Load: Building ka khud ka weight
-
Live Load: Human, furniture etc.
-
Wind & Seismic Load: Earthquake prone area me design
-
Load Combinations: IS 456 ke rules follow karna
6. Safety & Codes (सुरक्षा और कोड)
-
IS Codes:
-
IS 456 – Concrete
-
IS 1893 – Earthquake
-
IS 3370 – Water tanks
-
-
Fire safety aur escape routes
-
Ventilation & Lighting standards
-
Stair slope aur handrail height
7. Utilities & Services (सुविधाएँ)
-
Plumbing & Drainage layout
-
Electrical conduit planning
-
HVAC ducts (if applicable)
8. Site Survey & Planning (साइट सर्वे और प्लानिंग)
-
Plot leveling & contouring
-
Soil testing & bore log
-
Site drainage & rainwater management
-
Building orientation (Sunlight & Wind ke liye)
9. Documentation (दस्तावेज़)
-
Drawings: Plan, Section, Elevation, Detail
-
BOQ (Bill of Quantity)
-
Material Testing Reports
1. Site Survey & Planning (1–15)
-
Site leveling ka process
-
Plot orientation aur sunlight planning
-
Contour mapping
-
Soil testing aur bore log ka importance
-
Water table check
-
Site drainage planning
-
Rainwater harvesting concept
-
Access road aur site approach planning
-
Plot boundary verification
-
Plot area calculation
-
North direction finding (Compass)
-
Setting out of foundation
-
Site clearance before construction
-
Vegetation removal & site prep
-
Temporary site office setup
2. Foundation (16–30)
-
Types of foundation (Shallow/Deep)
-
Load transfer concept
-
Bearing capacity of soil
-
Uniform vs Differential settlement
-
Soil compaction importance
-
Footing excavation method
-
Base preparation before concrete
-
PCC (Plain Cement Concrete) under footing
-
Reinforcement detailing for footing
-
Foundation curing process
-
Dewatering for high water table
-
Foundation alignment check
-
Depth of foundation
-
Column positioning & layout
-
Anchor bolts installation
3. Concrete & Reinforcement (31–45)
-
RCC mix design knowledge
-
Water-cement ratio importance
-
Slump test for workability
-
Cube test for strength
-
Curing process & duration
-
Beam reinforcement placement
-
Column reinforcement placement
-
Slab reinforcement (one-way/two-way)
-
Bar bending schedule reading
-
Tying & binding of steel
-
Cover blocks use
-
Concrete pouring technique
-
Vibrator usage
-
Temperature & shrinkage control
-
Formwork removal timing
4. Masonry & Walls (46–55)
-
Brick vs Block masonry
-
Bond patterns (English/Flemish)
-
Plumb & level checking
-
Mortar mix ratio
-
Curing of masonry
-
Wall thickness check
-
Lintel installation
-
Control joints in walls
-
Cavity wall concept
-
Damp proof course (DPC) installation
5. Flooring & Finishing (56–65)
-
PCC & RCC flooring difference
-
Tile & marble laying method
-
Floor leveling
-
Screeding process
-
Expansion joints in flooring
-
Plastering mix ratio
-
Internal & external plaster
-
Surface finishing types
-
Painting prep & application
-
Waterproofing in terraces & bathrooms
6. Doors, Windows & Roofing (66–75)
-
Door & window alignment
-
Lintel & frame checking
-
Roofing types (RCC, truss, sheet)
-
Roof slope checking
-
Waterproofing in roof
-
Parapet wall construction
-
Skylight & ventilator installation
-
Roof reinforcement detailing
-
Drainage outlet provision
-
Temporary shuttering safety
7. Safety & Codes (76–85)
-
Personal protective equipment (PPE) use
-
Site safety signage
-
Fire safety awareness
-
First aid availability
-
Scaffolding safety
-
Ladder & stair safety
-
Electrical safety on site
-
Material storage safety
-
IS codes reference (IS 456, IS 1893, etc.)
-
Earthquake & wind load awareness
8. Utilities & Services (86–95)
-
Plumbing layout reading
-
Drainage slope checking
-
Water supply system
-
Electrical conduit layout
-
HVAC ducts (if applicable)
-
Rainwater drainage pipe installation
-
Sanitary fittings installation
-
Fire hydrant & pipeline checking
-
Cable trenching for electricity
-
Manhole & inspection chamber checking
9. Documentation & Quality Control (96–100)
-
Site daily report maintenance
-
Material testing record
-
Quality inspection checklist
-
Progress measurement (length, area, volume)
-
Bill of quantity (BOQ) verification